How-to7 Nov 2026
How many storeys can it take? An existing building in Rhino, the optopping in Grasshopper
The existing steel building is drawn once in Rhino and never changes. The new timber storeys on top are a Grasshopper study. Nextra Design checks the whole building at once, so every option shows what it does to the existing columns and beams.

An optopping (new storeys on an existing building) is the clearest case for combining Rhino and Grasshopper. The existing building is a fact: it is measured, drawn once and never changes. The new storeys are a question: how many, how high, which sections? And the answer always depends on the old building: every new storey loads its columns, beams and foundations.
Model the existing building in Grasshopper and you spend a day rebuilding something that will never move. Model the new storeys in Rhino and every option means redrawing them. In Nextra Design's Both mode you do neither: the existing building stays in Rhino, the optopping is a Grasshopper study, and every option is checked as one building.
#The existing building, drawn in Rhino

A three-storey steel office, 18 m by 12 m on a 6 m grid, 3.5 m storeys:
| Part | Section | Notes |
|---|---|---|
| Columns | HEB 220, S235 | continuous, fixed bases |
| Floor beams along X | IPE 400 | pinned, top flange held by the floor slab |
| Ties along Y | IPE 240 | pinned |
| Wall bracing | CHS 114.3x5 | end bays of all four walls, every storey |
| Existing floors | G 5.0 kN/m² (hollow core + screed), offices Q 2.5 kN/m² | |
| Existing roof, the floor of the optopping | G 4.0 kN/m², residential Q 1.75 kN/m² |
All of it is plain Rhino lines and points with Nextra attributes. Nothing here is parametric, because nothing here will change.
#The optopping, in Grasshopper

Glulam GL24h on the existing column grid: columns 240x240, floor beams 200x600, roof beams 200x480, ties 140x280, wall bracing and floor/roof diaphragm bracing 140x140. New floors G 1.5 + residential Q 1.75 kN/m², roof G 1.0 kN/m² + snow 0.56 kN/m². Two sliders drive it: the number of new storeys and the storey height. Nx Analyse runs with Model Grasshopper + Rhino (both): it takes the existing building from Rhino and the new storeys from Grasshopper, and the steel (EC3) and timber (EC5) members are designed in the same run.
#One building, one check

With four new storeys the whole building passes: the highest utilisation is 0.948, in the existing interior ground-floor columns (flexural buckling about the weak axis). The new timber columns reach 0.65, the existing floor beams 0.85 (from the office floors, the optopping does not change them).

The axial forces show where the new storeys end up: down through the timber columns into the existing columns, growing storey by storey to 1.48 MN at the bottom of the two interior columns.
#How many storeys can it take?
One slider, one run each, the whole building checked every time:
| New storeys | Existing interior ground-floor columns, u | Highest u in the building | Result |
|---|---|---|---|
| 2 | 0.766 | 0.845 (existing floor beam) | passes |
| 3 | 0.857 | 0.857 | passes |
| 4 | 0.948 | 0.948 | passes |
| 5 | 1.039 | 1.039 | 2 existing columns fail |

Each storey adds about 0.09 to the existing columns. So the answer for this building is four storeys, or five with the two interior ground-floor columns strengthened, which is exactly the kind of decision an optopping study is for. The Rhino part was not touched once.
#We checked it
| Check | Nextra Design | By hand |
|---|---|---|
| Timber columns land on the steel columns (2 storeys) | 110 nodes | 110 (72 grid nodes, 18 + 12 wall-bracing crossings, 8 diaphragm crossings) |
| Vertical reactions, permanent (2 storeys) | 3940.14 kN | 3564 kN applied + 376.14 kN self-weight |
| Vertical reactions, residential / offices / snow | 756.0 / 1080.0 / 120.96 kN | 1.75 x 216 x 2 / 2.5 x 216 x 2 / 0.56 x 216 |
| Existing floor beam, highest u | 0.845 | M = 57.7 kN/m x 6² / 8 = 259.7 kNm, M_pl,Rd IPE 400 S235 = 307.1 kNm: 0.846 |
| Existing interior column, 2 storeys | 0.766 | N_Ed ≈ 1178 kN, N_b,z,Rd = 1593 kN: 0.74 for the axial force alone (the check adds the bending) |
| Each extra storey | +0.091 | about 143 kN / 1593 kN = +0.090 |
#Why both
- Rhino for what exists: drawn once, from the survey or the old drawings, and left alone.
- Grasshopper for the study: only the new part, on sliders.
- Both for the answer: the new part on the old one, one model, one design, every option.
The model check helped too. In the first run the new columns had pinned bases and the floors had no bracing: Nextra Design reported a mechanism (the interior columns could turn and sway) before any number was used. With the columns fixed onto the steel columns and diaphragm bracing in the new floors, the building is stable.
Analysed with Nextra Design 0.1.0-beta.17. This is an example of the workflow: a real optopping also needs the existing connections, the foundations, wind and the robustness checked.