A timber hall on a concrete frame: two structures, two codes, one model

An existing concrete frame drawn in Rhino, a parametric timber truss hall on top in Grasshopper. Different material, code and structural system, designed in one run - and the sliders show what the hall does to the frame.

The last two examples combined steel with steel and steel with timber, but the new part always looked like the old one: more columns, more beams. Real projects are rarely like that. Here the two halves have nothing in common: an existing concrete frame, monolithic, drawn once in Rhino, and on top of it a timber hall with long-span trusses, a parametric study in Grasshopper. Different material, different design code, different structural system - and still one model, one analysis, one design.

#The concrete frame, drawn in Rhino

The existing two-storey concrete frame drawn in Rhino, with its floor loads, as 3D bodies

Part Section Notes
Columns 400 x 400, C30/37 fixed bases, monolithic joints
Beams along X (7.2 m spans) 300 x 600 carry the one-way slabs
Beams along Y 300 x 500
First floor G 6.0 kN/m², offices Q 2.5 kN/m²
Old roof slab, now the hall floor G 6.0 kN/m², C1 (tables) Q 3.0 kN/m²

Two storeys of 4 m on a grid of 3 x 7.2 m by 2 x 6 m. The bars are chosen by the EC2 design (bar sizes given as preferences: beams 20 / 16 mm, links 8 mm, columns 20 mm).

#The timber hall, in Grasshopper

The Grasshopper definition: three sliders, the hall generator, the timber elements, the load cases and Nx Analyse for the whole building

A column-free hall over the whole roof: glulam GL24h posts on the edge columns only, pitched trusses spanning the 12 m across, purlins, and bracing in the roof and the long walls of the end bays. Three sliders: post height, truss rise and number of panels. Roof G 1.0 kN/m², snow 0.56 kN/m². Nx Analyse runs Grasshopper + Rhino (both); the concrete is designed to EN 1992-1-1 and the timber to EN 1995-1-1 in the same run.

#One building

Before anything is analysed, the model view already shows what is what: 3D bodies of the real sections, coloured by material - concrete C30/37 from Rhino, glulam GL24h from Grasshopper. That is the moment to check that every member has the right material and section, and that the hall sits where it should on the frame.

The whole building before the analysis: 3D bodies coloured by material, C30/37 concrete below and GL24h glulam on top

After the run, the same view shows the utilisation:

The whole building as 3D bodies coloured by utilisation: the concrete frame below, the timber hall on top

233 members: 58 concrete from Rhino and 175 timber from Grasshopper, designed in one run. Read the two parts differently:

  • The timber hall is a check of the sections given: the trusses stay light (chords 0.34 and 0.40, posts 0.15, the wall bracing 0.48).
  • The concrete is designed: Nextra Design works out the reinforcement each member needs, so a beam at 1.00 means its bars are sized exactly to the governing limit - here the crack width under the quasi-permanent load. The hall floor beams (the old roof) need 580 mm² at the bottom and 841 mm² at the top at their worst section, with the extra steel for crack control included. The corner columns reach 0.99 in biaxial bending (their bars sized by the design as well, 20 mm bars preferred).

Axial force: the timber posts bring the hall down onto the edge columns; the interior concrete columns carry the floors, up to 1.19 MN

The axial forces show the two load paths: the light hall comes down through its posts onto the edge columns, while the interior concrete columns carry the two floors - up to 1.19 MN at the bottom.

#Move the sliders

Lower the truss rise from 2.5 m to 1.0 m and run again:

The same building with a flat 1.0 m truss rise: the timber chords turn yellow and orange

rise 2.5 m rise 1.0 m
Truss bottom chord 0.40 0.89
Truss top chord 0.34 0.74
Truss posts 0.15 0.42
Concrete beams / corner columns 1.00 / 0.99 1.00 / 0.99

A flatter roof works the trusses much harder - the bottom chord more than doubles - but the concrete frame does not notice: the hall is light and stands on the same columns. Higher posts (5 m instead of 3.5 m) load the wall bracing instead (0.48 to 0.74). Each option is one slider and one run; the concrete was never touched.

#What the whole-building check tells you

  • The old roof becomes a floor: the hall's use (category C1, 3 kN/m²) on the old roof slab sets the steel of those beams; the hall structure itself stands on the columns, not on the beams.
  • The hall is light: changing its shape changes the timber, not the concrete below it.
  • The edge columns carry the hall posts and reach 0.99 in biaxial bending: the place to look at first when the hall grows.
  • Concrete and timber, EC2 and EC5, in one design - no copying forces from one model into another.

#We checked it

Check Nextra Design By hand
Vertical reactions, offices / hall floor / snow 648.0 / 777.6 / 157.3 kN 2.5 / 3.0 kN/m² x 259.2 m², 0.56 kN/m² on 4 x 13 m of top chord (edge trusses half)
Self-weight applied 1380.04 kN concrete 53.088 m³ x 24.525 kN/m³ (2500 kg/m³) + GL24h 18.946 m³ x 4.12 kN/m³ = 1380.04 kN
Timber volume 18.946 m³ 18.946 m³ (posts, chords, webs, purlins, bracing, each by length x section)
Flat roof: snow on the shorter chords 147.2 kN 2 x 6.083 m x (2 x 4.03 + 2 x 2.02) kN/m = 147.2 kN

Building this example found one small thing in Nextra Design itself: the self-weight line in the messages left out the rigid joint zones of the concrete members (55 kN here), although the analysis applied them. That is fixed in 0.1.0-beta.18: the line now says 1380.04 kN, the same as the reactions.

Analysed with Nextra Design 0.1.0-beta.18. An example of the workflow: a real conversion also needs the slabs, the foundations, wind and the connections between the timber posts and the concrete checked.